Bored cast-situ reinforced concrete pile installation technology is the foremost and most popular deep foundation construction method for infrastructures, bridges, power stations and buildings. Bored pile construction by percussion method was introduced by a few foreign companies in the country since the mid-fifties of the last century. Unfortunately, no significant advancement or improvement had taken place until the end of the first decade of this century since inception. In 2011, a few general contractors introduced state of the art modern and sophisticated technique for the first time in the country.

We added our first hydraulic drilling rig to the existing fleet in 2013 and entered into the new era of bored pile construction history. Later we procured more equipment and parallelly strengthened our workforce by in-house job site and overseas training. As of today (Jan 2019) we have ten (10) drilling rigs with adequate supporting equipment like; crane, excavator, de-sanding unit, DG, air compressor, transporter etc. and we are now capable to take-up projects of any magnitude.

Bored Pile Resources at a Glance

1 Top head drive hydraulic drilling rig 11 nos
2 Lattice boom crawler crane 11 nos
3 RT Crane 3 nos
4 De-sanding Unit 5 nos
5 Turret base excavator 8 nos
6 Air compressor 9 nos
7 Wheel loader 2 nos
8 Diesel Generator 30 nos

Major Bored Pile Projects:

2018-19

  • 1500 φ 62m deep 532 nos pile for Viaduct of Rail Bridge over Rupsha River at Khulna.
  • 1200 φ, 1000 φ & 600 φ max 52m deep 304 nos bored pile for South Park Project (Westin Hotel) at Gulshan-2, Dhaka.
  • 1800 φ, 1500 φ, 1200 φ & 1000 φ 48m deep 725 nos bored pile for DMRT Line-6, CP 03 & 04.
  • 600 φ 25m deep 229 nos bored pile for Ware house project, Kaliakoir, Gazaipur.
  • 1500 φ & 1200 φ max 55m deep 661 nos bored pile for Dhaka-Khulna Highway (N8) Improvement Project (Package-l & 13), Faridpur, Dhaka.
  • 1200 φmax 50m deep 250 nosbored pile for Dhaka-Khulna Highway (N8) Improvement Project (Package-11), Dhaka.
  • 1200 φmax 50m deep 324 nosbored pile for Dhaka-Khulna Highway (N8) Improvement Project (Package-7), Dhaka.
  • 1200 φmax 53m deep 206 nosbored pile for Abdullapur flyover,Dhaka-Khulna Highway (N8) ImprovementProject, Dhaka.
  • 750 φmax 26.5m deep 412 nos bored pile for Managing Director House Project,Bashundhara RA, Dhaka.
  • 600 φ max 18mφ deep 889 nos bored pile for GPH lspat Project, Chittagong.
  • 750 φ &900 φ max 36m deep 884 nos bored pile for Bashundhar Oil & Gas Company Ltd Project, Dhaka.
  • 600 φ Max 28m deep 154nos bored pile for BAT Project, Kushtia
  • 1000 φ Max 40m deep 284nos bored pile for Bhulta Flyover project
  • 1000 φ Max 39.5m deep 234nos bored pile for Bridge under SASEC Road Connectivity Project, contract-01
  • 1000 φ Max 40m deep 652nos bored pile for Flyover, SASEC Road Connectivity Project, Contract-01
  • 600 φ Max 25.5m deep 111nos bored pile for Kanchpur, Meghna, Gumti 2nd bridges & Rehabilitation of Existing Bridges
  • 600 φ Max 25m deep 338nos bored pile for Bangabandu Satellite Ground Station 1& 2
  • 1000 φ & 1200 φ Max 42m deep 258nos bored pile for Dharala Bridge Project, Kurigram
  • 600 φ Max 20m deep 1084nos bored pile for Barapukuria Coal Fired Power Station
  • 750 φ Max 42m deep 299nos bored pile for Bangladesh Navy Dock Yard
  • 750 φ Max 26m deep 195nos bored pile for Shashanghasa Rail OverpassProject
  • 750 φ Max 30m& 36m deep 97nos bored pile for Hatirjheel Preservation, Parking & Management unit Building, Dhaka
  • 900 φ Max 20m deep 54nos bored pile for 2nd Titas railway bridge project
  • 750 φ Max 22m deep 195noss bored pile for Dhaka Convention Center Project
  • 600 φ Max 23m deep 60 nos bored pile for Nestle Factory Building Project, Rajendrapur
  • 1200 φ Max 40m deep 238nos bored pile for Padma Multipurpose Bridge Approach Road
  • 1000 φ Max 28m deep 195nos bored pile for Dhaleshwari Bridge, Tangail
  • 1000 φ Max 44m deep 331nos bored pile for PGCBHeadOfficeBuilding, Aftabanagar
  • 900 φ & 1200 φ Max 30 & 35m deep 270nos bored pile for Titas Rail Bridge Project
  • 1000 φ & 1200 φ Max 43.5m deep 81nos bored pile for Ghangachara Bridge Project, Rangpur
  • 1000 φ Max 24m deep 78nos bored pile for Khilgaon FlyoverLoop
  • 750 φ &1000 φ Max 32m deep 104nos bored pile for Bridge over Kaliganga River, Manikgonj
  • 1000φ & 1200 φ Max 30 & 35m deep 260nos bored pile for Eastern Bangladesh Bridge Improvement Project
  • 1000 φ Max 52m deep 168nos bored pile for Mahananda Bridge Project, Chapai Nawabgonj
  • 1000 φ & 1250 φ Max 52m deep 426 nos bored pile for Bancharampur Bridge Project, Comilla
  • 750 φ & 1250 φ Max 52m deep 220nos bored pile for Goffargaon-Shaltia Bridge Project, Mymensingh
  • 750 φ & 1000 φ Max 40m deep 227nos bored pile for Mirpur-Airport Road Flyover
  • 600 φ Max 25m deep 166nos bored pile for ACME laboratory building Dhamrai, Dhaka
  • 750 φ &900 φ Max 33m deep 110nos bored pile for Bridge Project at Uttara 3rd Phase
  • 1000 φ Max 28m deep 86nos bored pile for Hatirjheel-Begunbari Khal lntergrade Bridge
  • 1000 φ Max 28m deep 220nos bored pile for Hatirjheel-Begunbari Khal lntergrade Bridge
  • 900 φ & 1000 φ bored pile for Clinker Silo Project for Unique Cement at Meghnaghat
  • 1000 φ bored pile for Kin Bridge Project, Sylhet
  • 900 φ bored pile for Moulvibazar Bridge Project
  • 900 φ bored pile for Banani - Gulshan Link Bridge
  • 1200 φ bored pile for Kanaighat Bridge on Surma, Sylhet
  • 750 φ bored pile for Shah Poran Bridge Project (3rd) Surma, Sylhet
  • 1000φ &600 φ bored pile for Lafarge Cement Plant, Chattak,Sylhet
  • 750 φ bored pile for Hatubhdga RC Guarder Bridge, Mirzapore
  • 900 φ bored pile for Dhaka Sylhet Highway
  • 800 φ bored pile for SRNDP Project, Mawa
  • 600 φ bored pile for Water Front Project, Dhaka
  • 600 φ bored pile for MICement Factory Project, Munshigonj
  • 750 φ bored pile for Hatubangha Bridge Project
  • 450 φ bored pile for University Grant Commission Building Project
  • 450 φ bored pile for Hathajari- Rangunia Transmission Line




Bored Pile Photo Gallery

View