Bored cast-situ reinforced concrete pile installation technology
is the foremost
and most popular deep foundation construction method for infrastructures,
bridges, power stations and buildings. Bored pile construction by percussion
method was introduced by a few foreign companies in the country since the
mid-fifties of the last century. Unfortunately, no significant advancement or
improvement had taken place until the end of the first decade of this century
since inception. In 2011, a few general contractors introduced state of the art
modern and sophisticated technique for the first time in the country.
We added our first hydraulic drilling rig to the existing fleet in 2013 and
entered into the new era of bored pile construction history. Later we procured
more equipment and parallelly strengthened our workforce by in-house job
site and overseas training. As of today (Jan 2019) we have ten (10) drilling
rigs with adequate supporting equipment like; crane, excavator, de-sanding
unit, DG, air compressor, transporter etc. and we are now capable to take-up
projects of any magnitude.
1 | Top head drive hydraulic drilling rig | 11 nos |
---|---|---|
2 | Lattice boom crawler crane | 11 nos |
3 | RT Crane | 3 nos |
4 | De-sanding Unit | 5 nos |
5 | Turret base excavator | 8 nos |
6 | Air compressor | 9 nos |
7 | Wheel loader | 2 nos |
8 | Diesel Generator | 30 nos |